Ukai

Photograph | Attributes

Ukai

 
Location Vill: Ukai, Ta: Songadh, Dist : Surat
Purpose Irrigation, hydro power & flood control
River Tapi
Area of catchment 62225 km2
Mean annual runoff in the catchment 17226 Mm3
Mean annual rainfall 785 mm
Year of commencement of construction work. 1964
Year of completion 1972 Head works,1977 Canal works
Dam
Type Earthen & Masonry
Bed rock Basalt (Dolerite dykes)
Maximum height above the lowest point of foundation 80.58 m
Length at the top of the dam 4927 m
Total volume content: Concrete 0.21 Mm3

Masonry  

1.51 Mm3

Earthwork  

23.67 Mm3
Spillway
Type Ogee
Length 425 m
Energy Dissipator Ski jump bucket
Maximum discharge 49490 m3/s
Type, nos &
size of gate
Radial,22,
(15.545 m x 14.78 m)
Reservoir
Area at full reservoir level 520 km2
Gross storage capacity 8511 Mm3
Effective storage capacity 7092 Mm3
Area under submergence :
(a) Forest  (b) Waste land (c) Culturable
(a) 22258 ha  (b) 7522 ha    (c) 30352 ha
No of villages under submergence 69 partial, 98 full
Canal
Length of canal 73 (Left),48 (Right) ha
Capacity 35 (Left),45 (Right) m3/s
Gross command area 121410 (Left),
96310 (Right) ha
Culturable command area 85000 (Left),67000(Right) ha
Villages under command
(a) District (b) No. of Taluka (c) No. of villages
Surat 7 191
Valsad 3 71
Bharuch 3 100
 

Total

362
Area irrigated during last five years

Years

Area irigated in ha

1996-97 2,24,293
1997-98 2,34,390
1998-99 2,42,040
1999-2000 2,46,648
2000-2001 2,04,173
Power Plant
Type Under ground, river bed power house 
Hydraulic head 57 m to 34 m
Max. discharge 213 m3/s
Installed capacity 300 MW
Generating Units
Type generators-Umbrella type, vertical shaft, salient pole Turbines - Vertical shaft kaplan/turbine
Number 4 nos
Capacity 75 MW each
Firm 193 MW at 35% load factor contineously
Cost
Cost of the project Rs. 13896.15 lacs